Construction staffing

Every worker on site with the right cards and certifications

GettingDocs is construction staffing onboarding software that gathers the cards, licenses and paperwork a general contractor checks at the gate. Amy asks each craft worker for what they still owe over WhatsApp or email, checks every photo that comes back, and files it on their record in your ATS, so the crew you promised for Monday shows up with site access already sorted instead of a phone full of excuses.

A construction worker in a hi-vis vest on a phone call, her hard hat and work gloves under one arm, a city skyline behind her
Inbox
Two documents before your start date
Amy[email protected]Your domain08:02
Hi Nicole, before your start date could you reply with a photo of your OSHA 30 card and your journeyman license?
Thanks, Amy · Keystone Craft Staffing
No portal or loginTradespeople reply to a message. Nothing to download.
WhatsApp and emailSent from your agency, on the channel they read.
Checked on arrivalWrong or unreadable files are asked for again.
Filed to your ATSStraight onto the candidate's record.
The problem

A crew of 12 turns up on site. The GC sends three home because their OSHA 30 cards aren’t on file.

A general contractor asks for twelve craft workers on a commercial job starting Monday: electricians, a welder and general labor. Every worker needs an OSHA 30 card, the site-specific safety orientation, fall protection training and a clean drug screen on file before the badge is printed. The electricians also need a current journeyman license. Here is the same week, twice.

  1. Wednesday

    The order is confirmed. A recruiter phones twelve workers and emails a PDF checklist to anyone with an email address.

  2. Thursday

    Most send photos of their cards back to the recruiter’s personal phone. Some arrive, some don’t.

  3. Friday

    Two OSHA 30 cards come in as photos of the wrong card: an OSHA 10 and a forklift certificate.

  4. Friday evening

    A welder’s card is still sitting in a voicemail promise. The file goes to the GC incomplete.

  5. Monday, 6:30 a.m.

    At the gate, the GC’s safety manager checks the list and sends three workers home.

Three workers lose a day’s pay, the job starts short handed and the GC calls a competitor for the next order.

A site supervisor in a hard hat talking into a radio at a construction site
Where crews get stuckIt is almost never the worker’s skills. It is a card that lives in a truck, a wallet or someone’s camera roll.
How it works

Three steps, and nobody chases anybody

When a tradesperson is placed on a job, Amy messages them on WhatsApp or by email from your own domain, listing only what their file is missing. No portal, no login and no app. Craft workers reply with a photo taken on the job site.

Every file is filed as it arrives, then Amy opens it. A glare-covered card or the wrong certificate is sent back with a plain reason, and she keeps reminding on your schedule until the whole file is in. Anything she is unsure about goes to a one-click review queue.

Cards, licenses and forms are attached to the worker’s record in Zoho Recruit, Recruit CRM or Crelate, with an optional copy in Google Drive. Your team sees who is cleared for site access and who is not, crew by crew.

AmyKeystone Craft Staffing · WhatsApp
Hi Nicole, welcome to the crew! Before your start date I need a few things from you:
  • OSHA 30 card
  • Journeyman license
  • Fall protection training
  • Drug screen result
  • Form I-9 documents
A photo or PDF sent right here is perfect.

No portal, no login. Only what is still missing is ever asked for.

Document checklist

Construction worker certification tracking, from safety cards to I-9

Every general contractor and job site adds its own rules, but most construction worker onboarding checklists come down to the same four groups. Choose a placement type to see a typical file, and Amy asks each worker for exactly those documents.

Two workers on a scissor lift beneath a steel roof frame

OSHA card tracking and safety training6 of 6 documents

  • OSHA 10 card (OSHA 10-Hour Construction)
  • OSHA 30 card (OSHA 30-Hour Construction)
  • Site-specific safety orientation certificate
  • Fall protection training certificate
  • Confined space training certificate
  • NCCER credentials (craft training and assessments)
An electrician using a drill inside an open electrical panel

Trade licenses and skilled trades staffing compliance8 of 8 documents

  • Journeyman electrician license
  • Master electrician license
  • Plumbing license (journeyman or master)
  • HVAC license and EPA 608 certification
  • AWS welding certification (American Welding Society)
  • Crane operator certification (NCCCO)
  • Forklift operator certification
  • Aerial lift certification (scissor and boom lifts)
A gloved hand holding two blood sample tubes for lab testing

Screening3 of 3 documents

  • Drug screen results
  • Background check authorization
  • MVR (motor vehicle record) consent (driving roles)
A white hard hat beside site plans and a clipboard of paperwork

Craft labor onboarding paperwork6 of 6 documents

  • Form I-9 and identity documents
  • E-Verify confirmation (for jobs that require it)
  • Form W-4
  • Direct deposit form
  • Union card (union jobs)
  • Certified payroll details (prevailing wage jobs)

Form I-9, W-4, background check authorization, drug test consent and driver’s license come built in. Safety cards and trade licenses are set up once as your own document types, named the way your GCs name them, and Amy learns what workers call their cards.

Built for how you staff

Trade license and safety card collection for every kind of job

What a worker needs depends on the trade and the site. Chase rules in your ATS decide who is chased and for what, so each placement type gets its own list.

Integrations

Documents land in the ATS you already use

FAQ

Construction staffing questions

How do you onboard construction crews faster?

Ask every worker for everything they owe in one message, on the channel they actually check, and follow up until each file is complete. GettingDocs does this from the moment a placement lands in your ATS, so recruiters spend Friday filling orders instead of chasing cards.

What goes on a construction worker onboarding checklist?

Usually an OSHA 10 or OSHA 30 card, site-specific safety orientation, fall protection training, trade licenses and certifications for skilled roles, a drug screen, a background check authorization, Form I-9 and E-Verify, a W-4 and direct deposit, plus a union card or certified payroll details where the job calls for them.

Does GettingDocs do OSHA card verification or trade license verification?

No. GettingDocs collects the card and checks that it is the right document and readable, for example an OSHA 30 and not an OSHA 10. Confirming a card with the authorized trainer, or a license with the state lookup, stays with your team, who now start from a complete file.

How do we handle trade license expiration and renewals?

Chase rules read your ATS. If a candidate field or status in Zoho Recruit, Recruit CRM or Crelate shows a license or card is due for renewal, a rule asks that worker for the new one and files it on their record when it arrives.

Does it run drug screens, background checks or E-Verify?

No. Your screening providers and your team still do that. GettingDocs collects the signed consents and the results, so they sit on the worker’s record next to everything else. Decisions about who is cleared for site access stay with you.

Which applicant tracking systems does it work with?

Zoho Recruit, Recruit CRM and Crelate today, with Greenhouse coming soon. Documents attach to the worker’s record in your ATS, and can be copied to Google Drive if your team prefers.

Send crews that clear the gate the first time

See Amy collect a full site access file from one of your own tradespeople on a 15 minute call.

Two construction workers in hard hats sharing a smile on site

Other staffing industries